Log In | Contact Us| View Cart (0)
Browse: Collections Digital Content Subjects Creators Record Groups

St. Louis Union Station Architectural Drawings (WUA00363)

Overview

Scope and Contents

Administrative Information

Detailed Description

Series A

Series B

Series C

Series D

Series E

Series F



Contact us about this collection

St. Louis Union Station Architectural Drawings (WUA00363), 1891-1970 | WUA University Archives

Printer-friendly Printer-friendly | Email Us Contact Us About This Collection

Collection Overview

Title: St. Louis Union Station Architectural Drawings (WUA00363), 1891-1970Add to your cart.

ID: WUA/06/wua00363

Primary Creator: St. Louis Station Associates

Other Creators: Link, Theodore C. (Theodore Carl) (1850-1923)

Extent: 1500.0 Items

Arrangement:

The arrangement of the collection follows the scheme originally implemented by St. Louis Station Associates, into lettered and numbered sections, was retained by University Archives.

NOTE TO RESEARCHERS: When requesting a drawing please include the drawer number, drawing number, description, and date. The drawing number is the four digit number that preceeds the description for each item.

Series A1: General Site, circa 1892-1969

Series A2: Electrical and Steam Lines, circa 1930-1966

Series A3: Train Shed, circa 1892-1965

Series A4: Terminal Hotel, circa 1894-1964

Series A5: Headhouse, circa 1892-1957

Series B1: Railway Express Agency (REA) Building, ca. 1892-1893

Series B2: Train Shed, ca. 1892-1893 (see also A-3)

Series B3: Headhouse, Levels B and 1, ca. 1892-1964

Series B4: Headhouse, Levels 2-5 and Roof, ca. 1902-1967

Series B5: Midway and 1937 Addition, ca. 1903-1960

Series C1: Subway Buildings, ca. 1903-1955

Series C2: Subway, ca. 1893-1930

Series C3: Subway, ca. 1902-1903

Series C4: 1903 Train Shed Extension, ca. 1903

Series  C5: 1900 Record Plats for TRRA, ca. 1900

Series D1: Butterfly Sheds, ca. 1924-1953

Series D2: Mail Buildings, ca. 1903-1961

Series D3: Railroad Company Buildings (Pullman Co., Alton Railroad, Wabash Railroad, Penn-Vandalia Railroad), ca. 1903-1967

Series D4: Diesel Station & Outer Buildings

Series E1: Power House, 1903-1953

Series E2: Power House and Water Treatment, ca. 1902-1949

Series E3: Signal Bridges and Switching Tower 1, ca. 1903-1940

Series E4: Structural Miscellaneous (includes pumps, engine, and boiler rooms, etc.), ca. 1903-1966

Series E5: Ticket Office Revisions, ca. 1942

Series F1: Fred Harvey's, ca. 1944-1967

Series F2: Subways and Depot Master's Office, ca. 1903-1929

Series F3: Fragile drawings

NOTE TO RESEARCHERS: When requesting a drawing please include the drawer number, drawing number, description, and date. The drawing number is the four digit number that preceeds the description for each item.

Date Acquired: 00/00/1999

Subjects: Railroad stations--Missouri--Saint Louis., Railroad terminals--Missouri--Saint Louis Region., Union Station (St. Louis)

Languages: English

Scope and Contents of the Materials

The collection consists of approximately 1400 drawings documenting the construction of St. Louis Union Station, hotel, train shed, and associated buildings, along with many modifications to the station up to the 1970s.  Drawings from the 1890s-1920s are predominantly ink on white linen tracing cloth.  Other drawings include pencil on tracing paper, pencil on tracing cloth, mechanical reproductions including blueprints on paper, diazotypes on paper, and Xerox (electrostatic) prints on Mylar.

Approximate size and additional information given for select drawings, and items available in digital format are noted. 

NOTE TO RESEARCHERS: When requesting drawings please include the folder number, drawing number, description, and date. The drawing number is the four digit number that precedes the description for each item.

Collection Historical Note

Union Station is generally attributed to Theodore C. Link, as the predominate architect throughout the building project. He was joined by other architects in the initial phases, from 1891 -1894 when the station opened, and in the subsequent construction of the adjoining Terminal Hotel.  Drawings early in the process were signed “Theo. C. Link and Edward A. Cameron.”  Later tracings for the Terminal Hotel include work by Alfred Paist Rosenheim and William B. Ittner, along with Link.

St. Louis Union Station is considered by many experts to be the grandest and the most important railway edifice erected before the close of the 19th-century.  Combined with James Eads' successful endeavor to span the Mississippi River with a novel multi-level railway and pedestrian bridge that unimpeded river traffic, St. Louis Union Station stood as convincing proof that St. Louis was at the country's center for transportation in the middle-west.

The architects, Theodore C. Link and Edward A. Cameron, sought to purposely capture both the solidity and permanence of established European architectural styles coupled with clever and practical solutions to serve the [then] modern and thriving world of tractive steam locomotive engines.

The St. Louis Union Station train shed was designed by Washington University graduate George H. Pegram. Due to the enormous span planned for the St. Louis Union Station train shed, Pegram's patented railroad bridge truss design proved to be the most practical to fabricate. This resulted in the world's largest train shed, measuring 700 by 606 feet and supporting the operation of thirty-two terminating tracks and gates, nineteen miles of track line, 130 switches, and 103 signals.

A building of mammoth proportions and elegant ornamental decoration, St. Louis Union Station was intended to accommodate thousands of travelers and workers daily. The monumental head house featured numerous amenities including a luxurious hotel, a saloon, a dining hall, lunch rooms, lounges, ticket offices, several offices for the Terminal Railroad Association, and the world's first barrel-vaulted train station concourse, or "Grand Hall."

Over time, as tractive technologies evolved from steam to diesel and to diesel-electric powered engines, St. Louis Union Station too underwent countless changes. With the growing popularity of automobiles and aircraft as alternatives modes of transportation, St. Louis Union Station eventually fell into disuse by the late 1970s. In 1985, the complex was re-opened as a modern commercial center including a shopping complex.

Subject/Index Terms

Railroad stations--Missouri--Saint Louis.
Railroad terminals--Missouri--Saint Louis Region.
Union Station (St. Louis)

Administrative Information

Repository: WUA University Archives

Access Restrictions: Open. Appointments may be required to view this collection due to the large size of the items.

Use Restrictions:

Users of the collection must read and agree to abide by the rules and procedures set forth in the Materials Use Policies.

Providing access to materials does not constitute permission to publish or otherwise authorize use. All publication not covered by fair use or other exceptions is restricted to those who have permission of the copyright holder, which may or may not be Washington University.

If you wish to publish or license Special Collections materials, please contact Special Collections to inquire about copyright status at (314) 935-5495 or spec@wumail.wustl.edu. (Publish means quotation in whole or in part in seminar or term papers, theses or dissertations, journal articles, monographs, books, digital forms, photographs, images, dramatic presentations, transcriptions, or any other form prepared for a limited or general public.)

Acquisition Method: The collection was transferred to the Washington University Archives in 1999 by St. Louis Station Associates.

Original/Copies Note: Items reproduced in digital format are indicated by the note – Digitized.  Digital files are in full RGB color, unless noted as BW (black and white scan) or Grey (greyscale scan).   Inquire with staff for more information.

Preferred Citation: [Item description]. From the [collection title, series, box, folder]. University Archives, Washington University in St. Louis.

Processing Information: Processed by University Archives Staff.

Finding Aid Revision History: This finding aid was entered into Archon by Meg Tuomala in November 2012. Updated by Sarah Gabriel and Robert Manley in June 2017.

Other Note: NOTE TO RESEARCHERS: When requesting a drawing please include the drawer number, drawing number, description, and date. The drawing number is the four digit number that preceeds the description for each item.


Box and Folder Listing


Browse by Series:

[Series A],
[Series B],
[Series C],
[Series D],
[Series E],
[Series F],
[All]

Series CAdd to your cart.
Sub-Series 1: Subway Buildings, ca. 1903-1955Add to your cart.
Box DR 16.05Add to your cart.
Folder 1Add to your cart.
Item 1: Drawing #0917: Union Station Baggage Subway Erection Diagram, 1/1903Add to your cart.
Item 2: Drawing #0918: Union Station Baggage Subway Erection Diagram, 1/1903Add to your cart.
Item 3: Drawing #0942: Union Station Baggage Subway Details of Track Girders, 1/1903Add to your cart.
Item 4: Drawing #0943: Union Station Baggage Subway Details of Track Girders, 1/1903Add to your cart.
Item 5: Drawing #0944: Union Station Baggage Subway Details of Track Girders, 1/1903Add to your cart.
Item 6: Drawing #0946: Union Station Baggage Subway Details of Track and Platform Girders, 4/1903Add to your cart.
Item 7: Drawing #0967: Union Station Baggage Subway Details of Beams and Plates, 2/1903Add to your cart.
Item 8: Drawing #0968: Union Station Baggage Subway Details of Beams, Channels and Plates, 3/1903Add to your cart.
Item 9: Drawing #0969: Union Station Baggage Subway Details of Castings, 2/1903Add to your cart.
Item 10: Drawing #0981: Concrete platforms in train shed, 5/1922Add to your cart.
Item 11: Drawing #0993: Masonry Plan 18th Street Roadway-Main Subway, 12/1902Add to your cart.
Item 12: Drawing #0994: Masonry Plan-Main Subway, 1/1903Add to your cart.
Item 13: Drawing #0995: Plan and Details of Accumulator Pit on North Wall of Main Subway, 5/1904Add to your cart.
Item 14: Drawing #0996: Plan of North Elevators-Main Subway, 4/1903Add to your cart.
Item 15: Drawing #0997: Detail of Elevator Pit#17-Main SubwayAdd to your cart.
Item 16: Drawing #0998: Detail Plan of North Subway, 11/1903Add to your cart.
Item 17: Drawing #0999: Detail of Piers and Columns-Main Subway, 2/1903Add to your cart.
Item 18: Drawing #1000: Details of Granite Caps for Piers-Main Subway and Train Shed Extension, 3/1903Add to your cart.
Item 19: Drawing #1001: Details of South Wall-Main Subway, 5/1903Add to your cart.
Item 20: Drawing #1002: Details of South Wall-Main Subway, 3/1903Add to your cart.
Item 21: Drawing #1003: Details of South Wall-Main Subway, 3/1903Add to your cart.
Item 22: Drawing #1004: Details of South Wall-Main Subway, 3/1903Add to your cart.
Item 23: Drawing #1005: Details of South Elevator Pits-Main Subway, 6/1903Add to your cart.
Item 24: Drawing #1006: General Plan of North Subway, 5/1903Add to your cart.
Item 25: Drawing #1007: Plan of Vault in North Subway, 7/1903Add to your cart.
Item 26: Drawing #1008: Plan of North Subway with Adjacent Tracks and Platforms, 5/1903Add to your cart.
Item 27: Drawing #1009: General Plan of North Subway, 9/1903Add to your cart.
Item 28: Drawing #1010: Details of Cast Column under Column 27 in Headhouse, 12/1903Add to your cart.
Item 29: Drawing #1011: Plan of Steelwork in North Subway at entrance to Headhouse, 7/1903Add to your cart.
Item 30: Drawing #1012: General Plan of Check Room, 9/1903Add to your cart.
Item 31: Drawing #1013: North Subway showing Tubes and Pipes, 7/1903Add to your cart.
Item 32: Drawing #1020: Plan of Chute and Platform Ice House in South Subway, 3/1904Add to your cart.
Item 33: Drawing #1021: East Subway-Masonry, 9/1903Add to your cart.
Item 34: Drawing #1022: Pile Plan for False Work-Trough Floor over East SubwayAdd to your cart.
Item 35: Drawing #1023: Transformer Vault Plan West of Power House, 1/1904Add to your cart.
Item 36: Drawing #1026: General Plan and Sections of Main Subway, 7/1903Add to your cart.
Item 37: Drawing #1028: Location and Details of Scale Pits-Main Subway, 12/1903Add to your cart.
Item 38: Drawing #1029: Framing Details for Scale Pits, 6/1904Add to your cart.
Item 39: Drawing #1030: Plan of West end of Main Subway, 2/1904Add to your cart.
Item 40: Drawing #1032: Plan of Exhaust Room-Main Subway, 2/1904Add to your cart.
Item 41: Drawing #1034: Fence details at Baggage Room in Subway, 3/1904Add to your cart.
Item 42: Drawing #1035: Fence details at Baggage Room in Subway, 3/1904Add to your cart.
Item 43: Drawing #1036: Fence details at Baggage Room in Subway, 4/1904Add to your cart.
Item 44: Drawing #1037: General Plan of the "Central" for Pneumatic Tubes in Main Subway, 9/1903Add to your cart.
Item 45: Drawing #1038: Bracket for Pneumatic Tube Terminals in Baggage Subway, 4/1904Add to your cart.
Item 46: Drawing #1039: Plan showing sewer and drains in Subways and Express Buildings, 10/1903Add to your cart.
Item 47: Drawing #1040: Plan and Cross Sections Reconstructions of 29th Street Sewer, 11/1903Add to your cart.
Item 48: Drawing #1041: Plan of Sewer Wye and Reconstruction of 29th Street Sewer, 11/1903Add to your cart.
Item 49: Drawing #1042: Plan of Sewer SaddlesAdd to your cart.
Item 50: Drawing #1043: Details of Sewer and Downspout Manholes in Union Station Subway, 1/1904Add to your cart.
Item 51: Drawing #1044: Plan for changes in sewer under Union Station, 7/1903Add to your cart.
Item 52: Drawing #1045: Plan Showing sewer and drains in subways and express buildings, 11/1903Add to your cart.
Item 53: Drawing #1046: 1st Floor Plan Baggage PlatformAdd to your cart.
Item 54: Drawing #1047: Union Station Subway Plan showing clearance for elevators, 1/1903Add to your cart.
Item 55: Drawing #1048: Details of Steelwork for Subways, 5/1903Add to your cart.
Item 56: Drawing #1049: Plan showing changes in steelwork and location of elevators openings, 9/1903Add to your cart.
Item 57: Drawing #1050: Miscellaneous sketches in connection with the SubwayAdd to your cart.
Item 58: Drawing #1051: Plan of West Piers Signal Bridge #2, 2/1904Add to your cart.
Item 59: Drawing #1052: Plan Showing Signal Bridge Piers on Subway Wall, 1/1904Add to your cart.
Item 60: Drawing #1053: Platform over Subway between Tracks 16 and 17Add to your cart.
Item 61: Drawing #1054: Sections Guardrail for Track over SubwayAdd to your cart.
Item 62: Drawing #1055: Plan of Package Chute under Check Room-North Subway-, 4/1904Add to your cart.
Item 63: Drawing #1056: Plan and Section of Platform over Subway, North End of Adams Express, 3/1904Add to your cart.
Item 64: Drawing #1057: Details of Ventilators, 12/1903Add to your cart.
Item 65: Drawing #1058: Details of Ventilators-Union Station Subway, 12/1903Add to your cart.
Item 66: Drawing #1059: General Details of Truck Subway Ventilators, 12/1903Add to your cart.
Item 67: Drawing #1060: Proposed Location of Baggage House, 8/1903Add to your cart.
Item 68: Drawing #1061: Proposed Location of Mail Building at Union Station, 10/1903Add to your cart.
Item 69: Drawing #1062: Plan of Train Shed Pier Line 23 and Exhauster Room, 4/1903Add to your cart.
Item 70: Drawing #1063: Details of Platforming in Main Subway, 9/1903Add to your cart.
Item 71: Drawing #1031: Iron Strip for Subway Glasswork, 1903Add to your cart.
Folder 2Add to your cart.
Item 1: Drawing #0502: Entrances to Parking Lot, 10/1964Add to your cart.
Item 2: Drawing #0505: Suggested Gate Rearrangement for "Pay Parking Lot", 3/1970Add to your cart.
Item 3: Drawing #0507: Parking Lot Attendants Building, 7/1948Add to your cart.
Item 4: Drawing #0510: Parking Lot Expansion, 9/1964Add to your cart.
Item 5: Drawing #0914: General Details of North Subway, 1904Add to your cart.
Item 6: Drawing #0915: Masonry Details-half sections of subways, 1904Add to your cart.
Item 7: Drawing #0916: Union Station Baggage Subway Erection Diagram, 4/1903Add to your cart.
Item 8: Drawing #0919: Union Station Baggage Subway Masonry Plan, 1/1903Add to your cart.
Item 9: Drawing #0920: Union Station Baggage Subway Masonry Plan, 4/1903Add to your cart.
Item 10: Drawing #0921: Union Station Baggage Subway Column Detail, 1/1903Add to your cart.
Item 11: Drawing #0922: Union Station Baggage Subway Column Detail, 2/1903Add to your cart.
Item 12: Drawing #0923: Union Station Baggage Subway Column Detail, 2/1903Add to your cart.
Item 13: Drawing #0924: Union Station Baggage Subway Column and Girder Details, 4/1903Add to your cart.
Item 14: Drawing #0925: Union Station Baggage Subway Details of Trough Floor, 1/1903Add to your cart.
Item 15: Drawing #0926: Union Station Baggage Subway Details of Trough Floor, 1/1903Add to your cart.
Item 16: Drawing #0927: Union Station Baggage Subway Details of Trough Floor, 1/1903Add to your cart.
Item 17: Drawing #0928: Union Station Baggage Subway Details of Trough Floor, 2/1903Add to your cart.
Item 18: Drawing #0929: Union Station Baggage Subway Details of Trough Floor, 2/1903Add to your cart.
Item 19: Drawing #0930: Union Station Baggage Subway Details of Trough Floor, 2/1903Add to your cart.
Item 20: Drawing #0931: Union Station Baggage Subway Details of Trough Floor, 2/1903Add to your cart.
Item 21: Drawing #0932: Union Station Baggage Subway Details of Cross Girders, 1/1903Add to your cart.
Item 22: Drawing #0933: Union Station Baggage Subway Details of Cross Girders, 1/1903Add to your cart.
Item 23: Drawing #0934: Union Station Baggage Subway Details of Cross Girders, 2/1903Add to your cart.
Item 24: Drawing #0935: Union Station Baggage Subway Details of Cross Girders, 1/1903Add to your cart.
Item 25: Drawing #0936: Union Station Baggage Subway Details of Cross Girders, 2/1903Add to your cart.
Item 26: Drawing #0937: Union Station Baggage Subway Details of Cross Girders, 2/1903Add to your cart.
Item 27: Drawing #0938: Union Station Baggage Subway Details of Girders N8, N1, 2/1903Add to your cart.
Item 28: Drawing #0939: Union Station Baggage Subway Details of Cross Girders, 2/1903Add to your cart.
Item 29: Drawing #0940: Union Station Baggage Subway Details of Longitudinal Girders, 1/1903Add to your cart.
Item 30: Drawing #0941: Union Station Baggage Subway Details of Cross Girders, 1/1903Add to your cart.
Item 31: Drawing #0945: Union Station Baggage Subway Details of Longitudinal Girders, 5/1903Add to your cart.
Item 32: Drawing #0947: Union Station Baggage Subway Details of Longitudinal Girders, 5/1903Add to your cart.
Item 33: Drawing #0948: Union Station Baggage Subway Details of Platform Girders, 5/1903Add to your cart.
Item 34: Drawing #0949: Union Station Baggage Subway Details of Cross Girders, 2/1903Add to your cart.
Item 35: Drawing #0950: Union Station Baggage Subway Details of Girders BB, D3, 2/1903Add to your cart.
Item 36: Drawing #0951: Union Station Baggage Subway Details of Longitudinal Girders, 5/1903Add to your cart.
Item 37: Drawing #0952: Union Station Baggage Subway Details of Beams, 1/1903Add to your cart.
Item 38: Drawing #0953: Union Station Baggage Subway Details of Beams, 1/1903Add to your cart.
Item 39: Drawing #0954: Union Station Baggage Subway Details of Platform Beams, 1/1903Add to your cart.
Item 40: Drawing #0955: Union Station Baggage Subway Details of Platform Beams, 1/1903Add to your cart.
Item 41: Drawing #0956: Union Station Baggage Subway Details of Girders, 5/1903Add to your cart.
Item 42: Drawing #0957: Union Station Baggage Subway Details of Girders M4,M8 and F9, 5/1903Add to your cart.
Item 43: Drawing #0958: Union Station Baggage Subway Details of Platform Beams, 2/1903Add to your cart.
Item 44: Drawing #0959: Union Station Baggage Subway Details of Beams, 2/1903Add to your cart.
Item 45: Drawing #0960: Union Station Baggage Subway General Details, 1/1903Add to your cart.
Item 46: Drawing #0961: Union Station Baggage Subway Details of Girders X, X1 and Y, 2/1903Add to your cart.
Item 47: Drawing #0962: Union Station Baggage Subway Details of Girders, 2/1903Add to your cart.
Item 48: Drawing #0963: Union Station Baggage Subway Details of Beams, 2/1903Add to your cart.
Item 49: Drawing #0964: Union Station Baggage Subway Details of Light Supports, 2/1903Add to your cart.
Item 50: Drawing #0965: Union Station Baggage Subway Details of Floor Girders, 5/1903Add to your cart.
Item 51: Drawing #0966: Union Station Baggage Subway Details of Trough Floor, 2/1903Add to your cart.
Item 52: Drawing #0970: Alterations under tracks over subway (girder schedule), 5/1929Add to your cart.
Item 53: Drawing #0971: General Plan of Subways, 12/1902Add to your cart.
Item 54: Drawing #0972: Plan of typical panel in subway, 12/1902Add to your cart.
Item 55: Drawing #0973: Steelwork for girders in subway, 10/1903Add to your cart.
Item 56: Drawing #0974: Miscellaneous steelwork for subway, 10/1903Add to your cart.
Item 57: Drawing #0975: Extension of floor over East subway, 10/1924Add to your cart.
Item 58: Drawing #0976: Extension of floor at 20th and Clark, 2/1926Add to your cart.
Item 59: Drawing #0977: Additional structural steel needed over subway, framing plan, 9/1930Add to your cart.
Item 60: Drawing #0978: Additional structural steel needed over subway, framing plan, 9/1930Add to your cart.
Item 61: Drawing #0979: Repairs to Girder BB in North and Main Subway, 9/1953Add to your cart.
Folder 3Add to your cart.
Item 1: Drawing #0411: Water Line and Sewer PlanAdd to your cart.
Item 2: Drawing #0412: Proposed Lunchroom in Main Subway between Elevation #41N and #42N, 12/1942Add to your cart.
Item 3: Drawing #0430: Toilet Room West End of Main Subway, 12/1929Add to your cart.
Item 4: Drawing #0431: Cast Iron Inlets in Main Subway, 9/1904Add to your cart.
Item 5: Drawing #0432: Toilet Room at West End of Main Subway, 9/1904Add to your cart.
Item 6: Drawing #0471: Shelter for Baggage Department in Express Subway, 8/1943Add to your cart.
Item 7: Drawing #0478: Subway to connect Midway to Parking Lot, 7/1949Add to your cart.
Item 8: Drawing #0479: Subway to connect Midway to Parking Lot, 7/1948Add to your cart.
Item 9: Drawing #0480: Subway to connect Midway to Parking Lot, Plan under Baggage Building, 2/1949Add to your cart.
Item 10: Drawing #0481: Shelter for Subway connecting Midway and Parking Lot, 7/1949Add to your cart.
Item 11: Drawing #0482: Enlargement of Canopy over Subway 20th Street Entrance and attendants building, 11/1951Add to your cart.
Item 12: Drawing #0491: Proposed Subways for Baggage Mail and Express Trucking under Train Shed, 1/1947Add to your cart.
Item 13: Drawing #0498: 20th Street Parking Lot ElevationAdd to your cart.
Item 14: Drawing #0499: Parking Lot Expansion, 9/1964Add to your cart.
Item 15: Drawing #0501: Drainage Facilities for Parking Lot, 8/1964Add to your cart.
Item 16: Drawing #0508: Copper Canopy for Attendants Cabin in Parking Lot, 9/1950Add to your cart.
Item 17: Drawing #0511: Proposed Curbs for Parking Lot, 4/1964Add to your cart.
Item 18: Drawing #0512: Enlargement of Canopy over Subway Entrance and Attendants Building, 11/1951Add to your cart.
Item 19: Drawing #0513: Addition to Canopy on Parking Lot, 10/1951Add to your cart.
Item 20: Drawing #0636: Cabin for Baggagement at Northwest Corner of Main Subway, 9/1904Add to your cart.
Item 21: Drawing #0735: Elevator pit guards in main subway, 12/1929Add to your cart.
Item 22: Drawing #0762: Main Subway, proposed scale house, 8/1929Add to your cart.
Item 23: Drawing #0763: Proposed Cream Platform in subway, 12/1929Add to your cart.
Item 24: Drawing #0765: Additions of Milk Platform and check clerks office in subway, 3/1927Add to your cart.
Item 25: Drawing #0904: Relief valve for discharging flood water in subway, 10/1924Add to your cart.
Item 26: Drawing #0908: Iron Fence in Subway, 1/1910Add to your cart.
Item 27: Drawing #0909: Details of Elevator Installation in Subway, 5/1903Add to your cart.
Item 28: Drawing #0910: Plane of Ice Platform in South Subway (no longer standing), 9/1904Add to your cart.
Item 29: Drawing #0911: Masonry details-accumulator pit, 1904Add to your cart.
Sub-Series 2: Subway, ca. 1893-1930Add to your cart.
Box DR 16.06Add to your cart.
Folder 1Add to your cart.
Item 1: Drawing #1014: False Work Plan #2 South Subway, 8/1903Add to your cart.
Item 2: Drawing #1015: False Work Plan #3 South Subway, 10/1903Add to your cart.
Item 3: Drawing #1016: Pile Plan for Sump in South Subway, 11/1903Add to your cart.
Item 4: Drawing #1017: False Work Pile Plan South SubwayAdd to your cart.
Item 5: Drawing #1018: Masonry Plan South Subway, 4/1903Add to your cart.
Item 6: Drawing #1019: Masonry Plan South Subway, 8/1903Add to your cart.
Item 7: Drawing #1024: Masonry Plan of West Subway, 11/1893Add to your cart.
Item 8: Drawing #1025: General Plan and Details of Express Subway, 5/1903Add to your cart.
Item 9: Drawing #1027: Sewers, Drains, Water Mains and Conduits in Main Subway, 11/1903Add to your cart.
Item 10: Drawing #1065: Concrete Platform over North Subway, 3/1930Add to your cart.
Item 11: Drawing #1066: Concrete Platform over Main Subway Between East End at Track 24, 4/1930Add to your cart.
Item 12: Drawing #1067: Concrete Platform over Main Subway between Track 24 and Track 12, 4/1930Add to your cart.
Item 13: Drawing #1068: Concrete Platform over Main Subway between Track 11 and Track 2, 4/1930Add to your cart.
Item 14: Drawing #1069: Concrete Platform over South Subway between Track 17 and Track 18, 4/1930Add to your cart.
Item 15: Drawing #1070: Concrete Platform over Main and South Subways-Details, 4/1930Add to your cart.
Item 16: Drawing #1142: Union Station Baggage Subway-Details of Longitudinal Girders, 5/1903Add to your cart.
Item 17: Drawing #1143: Union Station Baggage Subway-Track and Platform Girders, 4/1903Add to your cart.
Item 18: Drawing #1144: Union Station Baggage Subway-Details of Platform Girders, 5/1903Add to your cart.
Item 19: Drawing #1145: Union Station Baggage Subway-Details of Floor Girders, 5/1903Add to your cart.
Item 20: Drawing #1146: Union Station Baggage Subway-Details of Longitudinal Girders, 5/1903Add to your cart.
Item 21: Drawing #1147: Alterations under Tracks over Subway-Girders, Columns and Braces, 5/1929Add to your cart.
Item 22: Drawing #1148: Alterations under Tracks over Subway-Columns, 5/1929Add to your cart.
Item 23: Drawing #1149: Alterations under Tracks over Subway-Columns, 5/1929Add to your cart.
Item 24: Drawing #1150: Alterations under Tracks over Subway-Beams, 5/1929Add to your cart.
Item 25: Drawing #1151: Alterations under Tracks over Subway-Girders G2 and G3, 5/1929Add to your cart.
Item 26: Drawing #1152: Alterations under Tracks over Subway-Girders, 5/1929Add to your cart.
Item 27: Drawing #1153: Alterations under Tracks over Subway-Girder G8, 5/1929Add to your cart.
Item 28: Drawing #1154: Alterations under Tracks over Subway-Beams and Girders, 6/1929Add to your cart.
Item 29: Drawing #1155: Alterations under Tracks over Subway-Girders 14A thru G1, 6/1929Add to your cart.
Item 30: Drawing #1156: Alterations under Tracks over Subway-Girders, 6/1929Add to your cart.
Item 31: Drawing #1157: Framing Plan East Section-Baggage Subway, 12/1902Add to your cart.
Item 32: Drawing #1158: Framing Plan Center Section-Baggage Subway, 12/1902Add to your cart.
Item 33: Drawing #1159: Framing Plan West Section-Baggage Subway, 12/1902Add to your cart.
Item 34: Drawing #1160: Special Details-Baggage Subway, 12/1902Add to your cart.
Item 35: Drawing #1161: Plan and Details of Steelwork-Subway between Power Plant and Express Buildings, 12/1902Add to your cart.
Item 36: Drawing #1162: Framing Plan of Proposed Rearrangement of West Section-Baggage Subway, 4/1903Add to your cart.
Item 37: Drawing #1163: Strain Street, Proposed Rearrangement of West Section-Baggage Subway, 4/1903Add to your cart.
Item 38: Drawing #1164: Framing Plan Changes in West Section-Baggage Subway, 10/1903Add to your cart.
Item 39: Drawing #1165: Girder Details Changes in West Section-Baggage Subway, 11/1903Add to your cart.
Item 40: Drawing #1166: Beam Details Changes in West Section-Baggage Subway, 11/1903Add to your cart.
Item 41: Drawing #1167: Framing Plan of Intersection of Express and West Subways, 10/1903Add to your cart.
Sub-Series 3: Subway, ca. 1902-1903Add to your cart.
Box DR 16.06Add to your cart.
Folder 1Add to your cart.
Item 1: Baggage Subway Documents (Blue Line Print), 1903Add to your cart.
Item 2: Elevator Prints (Blue Line Print), 1903Add to your cart.
Item 3: Extension of Subway (Blue Line Print), 1929Add to your cart.
Item 4: Alterations to Baggage Subway (Blue Line Print), 1929Add to your cart.
Item 5: Concrete Platforms over North Subway (Blue Line Print), 1930Add to your cart.
Item 6: Unnumbered Drawing, Shop Drawings of Subway Girdirs, 1903Add to your cart.
Sub-Series 4: Train Shed, ca. 1903Add to your cart.
Box DR 16.07Add to your cart.
Folder 1Add to your cart.
Item 1: Drawing #0142: Details of Brackets for Train Shed Extension, 6/1903Add to your cart.
Item 2: Drawing #0144: Extension to Train Shed for TRRA, 8/1903Add to your cart.
Item 3: Drawing #0145: Trusses of Train Shed Extension, 8/1903Add to your cart.
Item 4: Drawing #0146: Erection Diagram of Train Shed Extension, 8/1903Add to your cart.
Item 5: Drawing #1077: Anchor Bolt Plan-Train Shed Extension, 4/1903Add to your cart.
Item 6: Drawing #1078: Two Columns B28-Train Shed Extension, 6/1903Add to your cart.
Item 7: Drawing #1079: Two Columns C28-Train Shed Extension, 6/1903Add to your cart.
Item 8: Drawing #1080: Two Columns B27-Train Shed Extension, 6/1903Add to your cart.
Item 9: Drawing #1081: Two Columns C27-Train Shed Extension, 6/1903Add to your cart.
Item 10: Drawing #1082: Four Columns B25 plus C25-Train Shed Extension, 6/1903Add to your cart.
Item 11: Drawing #1083: Four Columns B23 plus C23-Train Shed Extension, 6/1903Add to your cart.
Item 12: Drawing #1084: Details of Columns A23 thru A28, 6/1903Add to your cart.
Item 13: Drawing #1085: Longitudinal Bracing Between Columns C22, C23 and B22, B23, 6/1903Add to your cart.
Item 14: Drawing #1086: Longitudinal Bracing Between Columns B23 thru B27, 6/1903Add to your cart.
Item 15: Drawing #1087: Longitudinal Bracing Between Columns B23 thru27, 6/1903Add to your cart.
Item 16: Drawing #1088: Details of Struts and Diagonals-Train Shed Extension, 6/1903Add to your cart.
Item 17: Drawing #1089: Details of Struts and Diagonals-Train Shed Extension, 6/1903Add to your cart.
Item 18: Drawing #1090: Details of Eaves Struts-Train Shed Extension, 6/1903Add to your cart.
Item 19: Drawing #1091: Details of Brackets for Columns C28-Train Shed Extension, 6/1903Add to your cart.
Item 20: Drawing #1092: Laterals-Train Shed Extensions, 4/1903Add to your cart.
Item 21: Drawing #1093: Horizontal Struts-Train Shed Extension, 4/1903Add to your cart.
Item 22: Drawing #1094: Horizontal Struts-Train Shed Extension, 7/1903Add to your cart.
Item 23: Drawing #1095: Bracing at Section B1-Train Shed Extension, 5/1903Add to your cart.
Item 24: Drawing #1096: Bracing at Section B2-Train Shed Extension, 5/1903Add to your cart.
Item 25: Drawing #1097: Bracing at Section B3-Train Shed Extension, 5/1903Add to your cart.
Item 26: Drawing #1098: End Section at Bracing B4-Train Shed Extension, 5/1903Add to your cart.
Item 27: Drawing #1099: Bracing at Section B5, B6, B7, B8-Train Shed Extension, 5/1903Add to your cart.
Item 28: Drawing #1100: Struts and End Bracing-Train Shed Extension, 5/1903Add to your cart.
Item 29: Drawing #1101: Details of Diagonals-Train Shed Extension, 5/1903Add to your cart.
Item 30: Drawing #1102: Bracing Between End Trusses at FE12, KA12-Train Shed Extension, 5/1903Add to your cart.
Item 31: Drawing #1103: Bracing Between End Trusses-Train Shed Extension, 5/1903Add to your cart.
Item 32: Drawing #1104: Bracing at KA KAY KAY1-2-Trains Shed Extension, 5/1903Add to your cart.
Item 33: Drawing #1105: Bracing Between Int. Trusses at Points-DC, HG, EF, DC1-2 - Train Shed Extension, 5/1903Add to your cart.
Item 34: Drawing #1106: Struts and Bot. Chd. -Train Shed Extension, 5/1903Add to your cart.
Item 35: Drawing #1107: Intermediate Trusses-Train Shed Extension, 4/1903Add to your cart.
Item 36: Drawing #1108: Intermediate Trusses-Train Shed Extension, 4/1903Add to your cart.
Item 37: Drawing #1109: Top and Bottom Chords for Center and Middle Trusses Bent 27-Train Shed Extension, 5/1903Add to your cart.
Item 38: Drawing #1110: Top and Bottom Chords for Center and Middle Trusses Bent 27-Train Shed Extension, 5/1903Add to your cart.
Item 39: Drawing #1111: Intermediate Trusses-Train Shed Extension, 5/1903Add to your cart.
Item 40: Drawing #1112: Bottom Chords, Arches, and Girts of Truss "tc2"-Train Shed Extension, 5/1903Add to your cart.
Item 41: Drawing #1113: Bottom Chords, Arches and Girts, Middle Truss, Bent 28-Train Shed Extension, 5/1903Add to your cart.
Item 42: Drawing #1114: Bottom Chords, Arches and Girts, Middle Truss, Bent 28-Train Shed Extension, 5/1903Add to your cart.
Item 43: Drawing #1115: Bottom Chords, Arches and Girts, Middle Truss, Bent 28-Train Shed Extension, 6/1903Add to your cart.
Item 44: Drawing #1116: Girts on End Trusses "C and Mid" Span-Train Shed Extension, 5/1903Add to your cart.
Item 45: Drawing #1117: Details of Girts-Train Shed ExtensionAdd to your cart.
Item 46: Drawing #1118: Tees for End Bay-Train Shed Extension, 5/1903Add to your cart.
Item 47: Drawing #1119: Side Trusses-Train Shed Extension, 5/1903Add to your cart.
Item 48: Drawing #1120: Side Trusses-Train Shed Extension, 4/1903Add to your cart.
Item 49: Drawing #1121: Bottom Chords for Side Trusses-Train Shed Extension, 5/1903Add to your cart.
Item 50: Drawing #1122: End Section of Side Trusses-Train Shed Extension, 5/1903Add to your cart.
Item 51: Drawing #1123: Bottom Chord and Arched Channel, End Truss-Train Shed ExtensionAdd to your cart.
Item 52: Drawing #1124: Bottom Chord and Arched Channel for Side Truss-Traim Shed Extension, 5/1903Add to your cart.
Item 53: Drawing #1125: Top and Bottom Laterals-Train Shed Extension, 5/1903Add to your cart.
Item 54: Drawing #1126: Details of End Truss, Longitudinal Ventilator-Train Shed Extension, 5/1903Add to your cart.
Item 55: Drawing #1127: Details of Intemediate Trusses, Longitudinal Ventilator-Train Shed Extension, 5/1903Add to your cart.
Item 56: Drawing #1128: Details of Panel #1, Transverse Ventilators-Train Shed Extension, 5/1903Add to your cart.
Item 57: Drawing #1129: Details of Panel #2 and #3 and Erection Diagram for Transverse Ventilators-Train Shed Extension, 5/1903Add to your cart.
Item 58: Drawing #1130: Details of Panel 4 and 5 of Transverse Ventilators-Train Shed Extension, 5/1903Add to your cart.
Item 59: Drawing #1131: Details of Panel 6 and 7 of Transverse Ventilators-Train Shed Extension, 5/1903Add to your cart.
Item 60: Drawing #1132: Details of Panel 8 and 9 of Transverse Ventilators-Train Shed Extension, 5/1903Add to your cart.
Item 61: Drawing #1133: Details of Panel 10 and 11 of Transverse Ventilators-Train Shed Extension, 5/1903Add to your cart.
Item 62: Drawing #1134: Struts-Train Shed Extension, 5/1903Add to your cart.
Item 63: Drawing #1135: Purlin Struts and Bay-Train Shed Extension, 5/1903Add to your cart.
Item 64: Drawing #1136: Main Roof Purlins-Train Shed Extension, 7/1903Add to your cart.
Item 65: Drawing #1137: Main Roof Purlins-Train Shed Extension, 5/1903Add to your cart.
Item 66: Drawing #1138: Ventilator Purlins End Struts-Train Shed Extension, 5/1903Add to your cart.
Item 67: Drawing #1139: Longitudinal Ventilator Purlins-Train Shed Extension, 5/1903Add to your cart.
Item 68: Drawing #1140: Tees for End Bay-Train Shed Extension, 5/1903Add to your cart.
Item 69: Drawing #1141: Extension to Column A28F, 12/1903Add to your cart.
Item 70: Unnumbered Item, Train Shed Extensions Drawing ListAdd to your cart.
Sub-Series 5: TRRA Missouri and Illinois, 1900Add to your cart.
Box DR 16.07Add to your cart.
Folder 1Add to your cart.
Item 1: Drawing #1328: Hard Bound Set-Record Plats Property and Tracks Owned and Leased by the TRRA in Missouri and Illinois (37 Sheets-Blueprints), 1/1900Add to your cart.

Browse by Series:

[Series A],
[Series B],
[Series C],
[Series D],
[Series E],
[Series F],
[All]


Page Generated in: 0.696 seconds (using 232 queries).
Using 11.96MB of memory. (Peak of 12.4MB.)

Powered by Archon Version 3.21 rev-3
Copyright ©2017 The University of Illinois at Urbana-Champaign